Consistent Quality, Lower Risk
Cosmetics touch the skin directly, so any output deviation, leak or contamination in a batch can damage a brand’s reputation. Comprehensive quality management and international certifications ensure every pump and sprayer delivers consistent performance at scale.
Only consistent quality builds long-term partnerships.
High-Standard Cleanroom Production
SUNYI balances R&D and quality to deliver high-quality custom products. Beyond our ISO 9001 and ISO 14001 certifications, we have passed factory audits by many leading international brands. From development and sampling to production, work environment and process control, everything meets strict standards, with rigorous cleanliness and inspection at every layer to keep production stable.
Our plant follows 6S management (Sort, Set in order, Shine, Standardize, Sustain, Safety) to keep people safe and the environment free of contamination.
- Dedicated visitor corridor: A separate visitor route keeps non-production staff out of production areas.
- Strict personnel dust control: Production staff change into cleanroom suits and shoes, wear caps and masks, and pass through a personnel air shower before entering the line.
- Separate dust control for people and materials: To keep outside dirt off the line, materials are moved from corrugated cartons into clean plastic boxes and pass through a goods air shower.
- Electrostatic dust removal: Trays pass through an electrostatic dust remover before use so dust and hair cannot cling to them.




End-to-End Quality Control
100% In-Line Inspection
A single pump or sprayer has 13–16 parts, and missing any one of them means it won’t work. Our automated assembly machines use infrared missing-part detection to ensure every unit is complete, with automatic air-tightness and suction test stations for 100% inspection on the machine during assembly.
We have also introduced a precision AOI (automated optical inspection) system that checks dimensions, flatness and sealing performance, using high-speed cameras and machine vision to detect and remove tiny defects so every gasket meets a consistent sealing standard.
Five-Stage Quality Control
| Stage | Details |
|---|---|
| IQC — Incoming | Strict inspection of raw materials. |
| IPQC — In-process | Operators self-check every 2 hours to keep the process stable. |
| PQC — Process QC | QA staff patrol semi-finished goods every 4 hours to catch issues early. |
| FQC — Final | Final quality check of finished goods against release standards. |
| OQC — Outgoing | Re-inspection before shipment for consistent quality. |
Multiple Tests and Outgoing Quality Control
Our ground-floor R&D lab has 7 dedicated technicians and 26 specialized instruments running about 100 tests aligned with international certifications and standards.
| Item | Inspection | Criteria | Instruments / tools |
|---|---|---|---|
| Dimensions | Dimensions match the drawing | Drawing | Calipers / vision measuring system |
| Structure | Compared with the standard sample | Standard sample / drawing | Microscope / magnifier |
| Color | Color control | Color tolerance (upper / mid / lower limit) | Light booth (D65) / colorimeter (flat parts) |
| Appearance | Appearance meets customer requirements | SUNYI / customer standard / limit samples | Inspection table / lamp / dot gauge |
| Function | Spray test, output volume, spray angle, vacuum test, empty-bottle weight | QA inspection sheet (SIP) Per R&D test definitions | Air compressor / positive-pressure tester / suction tester / electronic scale / spray-angle gauge |
| Reliability | Pull, pull-off, torque, removal torque, thread slip, environmental and adhesion tests | QA inspection sheet (SIP) Per R&D test definitions | Oven / life tester / temperature-humidity chamber / torque tester / push-pull gauge |
Sampling standard: MIL-STD-105E, special inspection level S-2 / general inspection level II, AQL 2.5.
Want to know more about SUNYI? Get in touch with us.
Contact